There?s a hole in City Field and this is the machine that put it there. Before a geothermal heating and cooling system can be installed at the Civic Center, a test hole must be drilled 300 feet down by 12 rods. The process began yesterday and will continue through today. Pictured is Parks and Recreation director Carlene Brown watching as Mid-State Drilling begins the process.