Skip to content

Track in need of re-surfacing

The Rotary Club Community Track, strolled by scores of Warren County cancer survivors and hundreds of their supporters and well-wishers during Friday’s Relay for Life, is due for renewal.

The elliptical running track bordering the Nunley Stadium football field has been in use since 1987 and, despite a limited face-lift some 10 years ago, needs a pricey re-surfacing job.

“We’re talking about $30,000, but that wouldn’t be close to a college-level, rubber track, which can cost $200,000,” Dr Neil Schultz commented. Schultz is a member of the Rotary Club of McMinnville, which spearheaded the construction of the track in 1986-87.

As in the original construction of the track, the Rotary Club will be inviting interested individuals and businesses to support the re-surfacing project, whose start date has not been determined. Paving material made with crumbs from recycled tires and which is especially friendly to runners and health-walkers is being studied as an early favorite among several options, Schultz said.

In the initial planning in 1985-86, Rotarians might have contemplated not more than a slight grading and paving project. Almost instantly, the agenda spiraled upward, demanding extenstive drainage systems both on the field and in the Middle School parking lots. Bridge Builders, Inc, and APAC Construction Company contributed heavy machinery and dynamite blasting expertise to allow the track project to proceed.

Scores of businesses, clubs and individuals contributed to the ultimate success of the plan, Schultz added.

Leave a Comment