FBC Renovation Celebration Sunday
It has been said that one never gets completely finished with a renovation project, and that is proving true with the major changes made to the auditorium at First Baptist Church.
The ten-month-long project is completed, with the exception of one stained glass window that will be coming at a later date. Congregation leaders are ecstatic with the results made to the auditorium, which had basically been the same since 1976. The church suffered a massive fire that year, destroying the entire building, along with numerous lovely stained glass windows.
?I?ve been told about those windows,? said Sean Gossett, pastor of music and worship. I even have photos of them on my computer, and they were beautiful. The new ones are somewhat different from those windows, but are still very lovely.?
Along with replacing the windows, the auditorium has received a new coat of a lighter color of paint, new lighting, new projector and video equipment and new carpet. The platform area has been rebuilt, and the auditorium boasts the new radiance-style pews that curve around the room. A tiled wall is at the back of the baptistery, featuring a mosaic inlay cross on the inside.
Everyone is invited to attend a special Renovation Celebration on Sun., March 25 at 4 p.m. A special musical program will be presented, the choir will perform, as well as the ?Blessed Ensemble.? A message will be offered by Pastor Bill Martin and will welcome special guests to the service. A reception will be held in the fellowship hall following the service.
The renovation committee includes: Wally Bigbee, chairman; Ryan Moore, secretary; Anita Moore, Theresa Chastain, Ann Becker, Betty Howard, Johnny Atnip, Pastor Bill Martin and Sean Gossett.
