Skip to content

Stan?s Service set to be demolished

Stan?s Service set to be demolished
Persistence has paid off for Central Church of Christ. The church will be expanding after 15 years of waiting. To accomplish this, the building adjacent to the church will be demolished.

According to church elder Ken Smith, the building is located at 103 E. Morford Street, is currently occupied by Stan?s Service, and was owned by Frank and Peggy McColloch. The building was built by her father in the 1940s.

For the past 15 years, the church has been asking to purchase the building. Despite its persistence, the couple has refused. Recently, the couple agreed to sell the building and the church jumped at the opportunity.

There are two reasons for the purchase ? expansion and fixing an existing problem.

Currently the church has 600 members and a tremendous growth in young people. This has led to the need for more space.

?We desperately need to go ahead and expand Central,? said Smith. ?The auditorium has no bathrooms. The only bathrooms in the facility are in the education wing. They are very small. Also, the nursery being downstairs is also a problem.?

While renovating the annex building, which was a chicken slaughterhouse, church members noticed severe damage to the inside of the west wall. The inside had to be completely re-worked at that time to make it as safe as possible. Unfortunately, it was impossible to do anything to the outside of the wall because it was impossible to reach due to the McColloch building.

?The wall is deteriorating and it?s a necessity to fix that,? said Smith. ?The only way we can do that is to demolish the McColloch building.?

According to Smith, the church?s structural engineer, architect and Waymon Hale Construction Company all took a look at the McColloch building and agreed the building was deteriorating.

The expansion will solve all the problems listed. The bottom story will be used as a classroom to house 75 to 100 people, it will include restrooms and a family changing room. There will be a full-size nursery that will eliminate the downstairs nursery, as well as another classroom and a welcome center.

The basement will be expanded to make a larger area for fellowship meals, an activity center and classrooms. The present basement will hold 350 during meals. During the last meal, over 400 attended.

Waymon Hale Construction will be handling the demolition which is scheduled for some time in the fall. Stan Hankal, owner of Stan?s Service, will be allowed plenty of time to relocate his business. The building will be down before winter and construction will not begin until next year.

The new structure will be made of the same brick currently used in the church and surrounding buildings to fit in with the area. Wood windows will be used, as vinyl windows are not allowed in historic buildings.

The church presented its expansion plans Tuesday to the McMinnville Historic Zoning Commission asking for a certificate of appropriateness. The plans to demolish the building were approved.

Leave a Comment